Project info

Project overview

construction to operation phase including buildings BIM scope including LOD 300 models check and validation, clash detection reports and solutions, upgrading the models to LOD 350 BIM models by close coordination with the project stakeholders and performing the clash detection checks and reports to solve the clashes on spot and generate the IFC updated drawings that are workable for the contractor and the sub-contractor teams, then upgrading the BIM models into the LOD 400 models aligned with the material submittals and generating the Shop drawings from the BIM approved models, and keeping the models Up To Date and aligned with the site situation at all the stages enriched with the COBie parameters and maintenance manuals and FM information needed.